Preliminary Budget AnalysisThe firm prides itself on
treating each project as unique entities with unique requirements.
As such, PAI's analysis of the FF&E budget will accommodate the
client's needs, the designer's vision and the positioning of the
property in the marketplace. Model Room Development and ReviewThe firm will be actively involved during the model room design
development stage. If PAI has been contracted in the early stages of
the project, we will lend our assistance to the designer in
recommending sources for the manufacture of the one-off quantities
required for the model who would be among the likely sources also
capable of producing in quantity and at a competitive price.
With sufficient timing allowed for this important stage, the firm
can also begin the value engineering process. Interior Design Specification and Drawing ReviewIn an effort to minimize questions during the bid process, PAI
will review the designer's documents and jointly resolve any
ambiguous information therein.
Quantification AnalysisThe firm's project team will initiate a physical count or
"take-off" of each FF&E item from the designer's coded plans and
compare the results with the quantities provided by the designer.
Any discrepancies will be addressed with the designer, and a
resolution determined, prior to the issuance of the purchase orders
and final cost reporting.
Project Scheduling/CPM DevelopmentPursuant to the client's objectives, and reflective of the
timelines of the work of the other project consultants, PAI will
develop a CPM which will mesh all of the milestones into one
cohesive and comprehensive schedule.
Cash Flow DocumentPAI will prepare for the client a cash flow document indicating
anticipated monthly cash flow of the FF&E through project completion
stage.
Pre-Bid QualifyingThe firm will "qualify" all potential bidders of FF&E by
assessing their current financial stability and factory
capabilities. Any recent management changes will be analyzed to
determine possible impact on customer service, quality control
and production capacity. The list of bidders to be
pre-qualified will include the designer's specified sources as well
as client recommendations.
Source RecommendationsPAI will recommend for consideration to the designer and client
all manufacturing sources that have recently provided the firm with
the best "value"; i.e., the best quality-for-price ratio, excellent production
capability and superb custom service.
Competitive BiddingThe firm will prepare comprehensive bid document packages for
release to the final approved list of bidders of FF&E. The bid
documents encompass all relevant information needed in order that
each bidder will have a full and complete understanding of the work.
Bid Analysis & Value EngineeringAfter receipt of all bids, PAI will analyze each for completeness
and thoroughness. The firm will resolve any questions with each
bidder before preparing spreadsheets for each bid category. One of
the most crucial components of the FF&E bid process is the
discussion with each bidder of the way in which to engineer the item
to obtain the best value for the client without sacrificing the
designer's vision. PAI excels in this process.
Bid Summary & RecommendationsThe results of the bid analysis and value engineering process
will be presented to the client and designer. PAI will discuss the
merits of each bid and provide the rationale for their award
recommendation. Before the award is finalized, the firm may
coordinate for the client a personal interview with a number of the
bidders along with a visit to their facilities.
Contract NegotiationsThe firm will negotiate the most favorable contract package with
the bidders encompassing price, payment terms, production schedule
and other salient issues. The client is encouraged to be personally
involved with PAI in this process.
Purchase Order Preparation & TransmittalAfter presentation of a final FF&E cost report, and based on the
results of the final contract decisions, PAI will prepare purchase
orders and contracts as Agent for the client. A draft version of
each document will first be sent to the designer for review and
approval, prior to the original contract documents being submitted
to the client for approval.
Order ExpeditingAs one of the most important links to the success of the project,
PAI provides continuous follow up with each vendor to ensure
compliance with promised ship dates and to resolve any issues that
could prevent timely shipment.
Actual vs. Budget ReportingThe firm maintains cost controls for FF&E with itemized reporting
to the client that details the variance between the original
approved budget and the current forecast. Updates are
provided monthly or as required by the client.
Delivery Status ReportingPAI provides continuous updates
on the delivery status of each FF&E item through their
affiliate, Strategic Project Services.
Vendor Invoice Auditing/Payables ReportingThe firm's accounting department audits each vendor invoice
against the purchase documents. After internal approval, the audited
invoices are forwarded to the client for final approval prior to
payment within the vendor's agreed terms.
Fire Certification DocumentationPAI obtains all necessary fire certification compliance
documentation for each vendor. The certificates are presented to the
client in bound format prior to project completion.
Attic Stock InventoryThe firm maintains a separate
inventory of all purchases made for project attic stock. The
client's attic stock is always
maintained separately from the quantities required for the project
installation.
Project Closeout DocumentationAt project completion, final, reconciled and audited reports are
presented to the client representing the complete cost of the FF&E
including all final freights costs, taxes, and discounts as well as
status of any open items, damaged items, or non-conforming items,
and the action required in order to reach an expeditious conclusion.
Freight Management & LogisticsThe firm will utilize the services of
their affiliate, Strategic Project Services, a freight logistics
specialist who is in tune with the intricacies of FF&E
transportation.
Furniture LiquidationShould the Owner require
liquidation of the existing product, the Firm will secure the
services of an expert in hotel liquidations.
On-site Installation CoordinationThe Owner will require an FF&E coordination specialist to
represent his interest on the site for 3-6 months prior to the
project completion. In the event the Owner has not already retained
the services of such an individual, PAI can either recommend
qualified individuals to the Owner or we can include these services
as part of a turn-key contract.
Warehousing and InstallationThe firm will secure bids and procure the
services of a specialist in the warehousing, inventory and
installation of Hotel FF&E. These services could either be part of a
total turn-key packages or can be let by the firm, on the Owner's
behalf, as a third-party contract. |
|